this post was submitted on 09 Sep 2026
104 points (99.1% liked)

Australia

5158 readers
221 users here now

A place to discuss Australia and important Australian issues.

Before you post:

If you're posting anything related to:

If you're posting Australian News (not opinion or discussion pieces) post it to Australian News

Rules

This community is run under the rules of aussie.zone. In addition to those rules:

Banner Photo

Congratulations to @Tau@aussie.zone who had the most upvoted submission to our banner photo competition

Recommended and Related Communities

Be sure to check out and subscribe to our related communities on aussie.zone:

Plus other communities for sport and major cities.

https://aussie.zone/communities

Moderation

Since Kbin doesn't show Lemmy Moderators, I'll list them here. Also note that Kbin does not distinguish moderator comments.

Additionally, we have our instance admins: @lodion@aussie.zone and @Nath@aussie.zone

founded 3 years ago
MODERATORS
 

We are calling for an urgent moratorium on AI data centre construction in Australia until safeguards for communities, energy supply and the environment are legislated.

Big Tech corporations are forcing huge data centres onto local communities across Australia (and the rest of the world), with virtually no democratic engagement with local communities.

Data centres are expected to draw as much power from the grid by 2036 as all homes in NSW and Victoria do today - we cannot stand by and let this happen. Without drastic intervention from state and federal governments, Australia’s energy transition is at risk of being derailed by Big Tech and their data centres.

Australia urgently needs a moratorium on new data centre construction until safeguards for people, communities, cultural heritage, and the environment are legislated. We demand a national moratorium until we have laws that include:

  • Consent from Traditional Owners: No site moves forward without free, prior, and informed consent from the Traditional Owners

  • A new strong approval process: No rubber stamps for approvals. A rigorous, transparent assessment of environmental and community impacts, including consultation.

  • 100% renewable energy: All data centres must be powered 100% by new renewable energy not coal and gas

  • Recycled water used: A closed loop system where water is recycled and no local drinking water is used; best practice water use is enforced

  • Protection of sacred sites: That all data centres across the country, including Weddell in the NT, are protecting sacred sites and springs

  • An AI data centre regulator... empowered to audit, penalise, and shut down non-compliant operations

you are viewing a single comment's thread
view the rest of the comments
[–] geematic@aussie.zone 3 points 6 days ago (1 children)

Im starting to wonder if data centres are a pretext to grab and hold licenses to as much fresh water as possible. Awaiting the announcement of their pivot to water speculating

[–] arbilp3@aussie.zone 1 points 6 days ago

That is a really interesting point. Please let us know if you find anything out.