Ask Lemmy
A Fediverse community for open-ended, thought provoking questions
Rules: (interactive)
1) Be nice and; have fun
Doxxing, trolling, sealioning, racism, and toxicity are not welcomed in AskLemmy. Remember what your mother said: if you can't say something nice, don't say anything at all. In addition, the site-wide Lemmy.world terms of service also apply here. Please familiarize yourself with them
2) All posts must end with a '?'
This is sort of like Jeopardy. Please phrase all post titles in the form of a proper question ending with ?
3) No spam
Please do not flood the community with nonsense. Actual suspected spammers will be banned on site. No astroturfing.
4) NSFW is okay, within reason
Just remember to tag posts with either a content warning or a [NSFW] tag. Overtly sexual posts are not allowed, please direct them to either !asklemmyafterdark@lemmy.world or !asklemmynsfw@lemmynsfw.com.
NSFW comments should be restricted to posts tagged [NSFW].
5) This is not a support community.
It is not a place for 'how do I?', type questions.
If you have any questions regarding the site itself or would like to report a community, please direct them to Lemmy.world Support or email info@lemmy.world. For other questions check our partnered communities list, or use the search function.
6) No US Politics.
Please don't post about current US Politics. If you need to do this, try !politicaldiscussion@lemmy.world or !askusa@discuss.online
Reminder: The terms of service apply here too.
Partnered Communities:
Logo design credit goes to: tubbadu
view the rest of the comments
Does a bell ring? Basically yes, at least in my state. Days that are extreme in either direction (hot/cold) require considerably more electricity. Say its gonna be 105 F today. Major utility plants will all be operating at as close to max output as possible. Some plants even exist mostly to only come on line in high demand times.
How long does it take to ramp up from cold? Completely depends on the system but ideally you bring any boiler/steam system up slowly and progressively. Most boilers are kept warm enough to start relatively quickly. To truly start from cold takes awhile, trying to rush that process can be dangerous.
That's pretty neat! Is there a central computer system that determines which power company or which specific plant needs to turn on or ramp up, or do y'all just jockey to fill the need first so your company gets paid?
Everything is organized at a high level depending on the state/municipality. I'm currently in a very large hospital plant but we are also considered a utility. So, we generate 95% of the hospitals electricity day to day. We could generate 100% but we want to stay tied to the utility. So, sometimes on high demand days we get called on to produce as much as possible and feed back to the grid. The money generated by that feeding goes back into the hospital's bank account. At some plants operators and engineers get FAT bonuses based on total generation.
That's interesting! Thank you.