Non-paywall link: https://archive.is/73XhB

you are viewing a single comment's thread
view the rest of the comments
[–] 4 points 4 months ago (1 child)

If it helps. That is the "earliest estimate"

Pretty sure, every controller they have is going to go out with the Frame or the Machine from now til then. Need to justify the (almost guaranteed) $1000+ MSRP.

  • source
  • parent
  • hideshow 1 child comment
  • I was imagining they just didn't want to give too specific of estimates, so before September just means anytime between now and September (with September being the latest possible time you could get it). I guess we will see though, I imagine they definitely want stock to be able to ship with Machines though, so maybe they will slow out the amount they send out.

  • source
  • parent